Surveying is concerned with the fixing of position whether it be control points or points of topographic
detail and, as such, requires some form of reference system.
The physical surface of the Earth, on which the actual survey measurements are carried out, is not
mathematically definable. It cannot therefore be used as a reference datum on which to compute position.
Alternatively, consider a level surface at all points normal to the direction of gravity. Such a surface
would be closed and could be formed to fit the mean position of the oceans, assuming them to be free from
all external forces, such as tides, currents, winds, etc. This surface is called the geoid and is defined as the
equipotential surface that most closely approximates to mean sea level in the open oceans.An equipotential
surface is one from which it would require the same amount of work to move a given mass to infinity no
matter from which point on the surface one started. Equipotential surfaces are surfaces of equal potential;
they are not surfaces of equal gravity. The most significant aspect of an equipotential surface going through
an observer is that survey instruments are set up relative to it. That is, their vertical axes are in the direction
of the force of gravity at that point. A level or equipotential surface through a point is normal, i.e. at right
angles, to the direction of gravity. Indeed, the points surveyed on the physical surface of the Earth are
frequently reduced, initially, to their equivalent position on the geoid by projection along their gravity
vectors.
The reduced level or elevation of a point is its height above or below the geoid as measured in the
direction of its gravity vector, or plumb line, and is most commonly referred to as its height above or below
mean sea level (MSL). This assumes that the geoid passes through local MSL, which is acceptable for most
practical purposes. However, due to variations in the mass distribution within the Earth, the geoid, which
although very smooth is still an irregular surface and so cannot be used to locate position mathematically.
The simplest mathematically definable figure which fits the shape of the geoid best is an ellipsoid formed
by rotating an ellipse about its minor axis. Where this shape is used by a country as the surface for its
mapping system, it is termed the reference ellipsoid. Figure 1.1 illustrates the relationship between these
surfaces.
The majority of engineering surveys are carried out in areas of limited extent, in which case the reference
surface may be taken as a tangent plane to the geoid and the principles of plane surveying applied. In other
words, the curvature of the Earth is ignored and all points on the physical surface are orthogonally projected
onto a flat plane as illustrated in Figure 1.2. For areas less than 10 km square the assumption of a flat Earth is
perfectly acceptable when one considers that in a triangle of approximately 200km2, the difference between
the sum of the spherical angles and the plane angles would be 1 second of arc, or that the difference in length
of an arc of approximately 20 km on the Earth’s surface and its equivalent chord length is a mere 8 mm.
The above assumptions of a flat Earth, while acceptable for some positional applications, are not
acceptable for finding elevations, as the geoid deviates from the tangent plane by about 80 mm at 1 km or
8 m at 10 km from the point of contact. Elevations are therefore referred to the geoid, at least theoretically,
but usually to MSL practically.
to several kilometres with millimetre precision, depending on the distance measured; lasers and northseeking
gyroscopes are virtually standard equipment for tunnel surveys; orbiting satellites are being used
for position fixing offshore as well as on; continued improvement in aerial and terrestrial photogrammetric
and scanning equipment makes mass data capture technology an invaluable surveying tool; finally, data
loggers and computers enable the most sophisticated procedures to be adopted in the processing and
automatic plotting of field data.
Monday, 1 February 2016
PRINCIPLES,Control,Economy of accuracy in surveying
1.2
PRINCIPLES
Every
profession must be founded upon sound practice and in this engineering
surveying is no different.
Practice
in turn must be based upon proven principles. This section is concerned with
examining the
principles
of survey, describing their interrelationship and showing how they may be
applied in practice.
Most
of the principles below have an application at all stages of a survey and it is
an unwise and
unprofessional
surveyor who does not take them into consideration when planning, executing,
computing
and
presenting the results of the survey work. The principles described here have
application across the
whole
spectrum of survey activity, from field work to photogrammetry, mining
surveying to metrology,
hydrography
to cartography, and cadastral to construction surveying.
1.2.1
Control
A
control network is the framework of survey stations whose coordinates have been
precisely determined
and
are often considered definitive. The stations are the reference monuments, to
which other survey work
of a
lesser quality is related. By its nature, a control survey needs to be precise,
complete and reliable and
it
must be possible to show that these qualities have been achieved. This is done
by using equipment of
proven
precision, with methods that satisfy the principles and data processing that
not only computes the
correct
values but gives numerical measures of their precision and reliability.
Since
care needs to be taken over the provision of control, then it must be planned
to ensure that it
achieves
the numerically stated objectives of precision and reliability. It must also be
complete as it will
be
needed for all related and dependent survey work. Other survey works that may
use the control will
usually
be less precise but of greater quantity. Examples are setting out for
earthworks on a construction
site,
detail surveys of a greenfield site or of an as-built development and
monitoring many points on a
structure
suspected of undergoing deformation.
The
practice of using a control framework as a basis for further survey operations
is often called ‘working
from
the whole to the part’. If it becomes necessary to work outside the control
framework then it must
be
extended to cover the increased area of operations. Failure to do so will
degrade the accuracy of later
survey
work even if the quality of survey observations is maintained.
For
operations other than setting out, it is not strictly necessary to observe the
control before other
survey
work. The observations may be concurrent or even consecutive. However, the control
survey must
be
fully computed before any other work is made to depend upon it.
1.2.2
Economy of accuracy
Surveys
are only ever undertaken for a specific purpose and so should be as accurate as
they need to be, but
not
more accurate. In spite of modern equipment, automated systems, and statistical
data processing the
business
of survey is still a manpower intensive one and needs to be kept to an economic
minimum. Once
the
requirement for a survey or some setting out exists, then part of the
specification for the work must
include
a statement of the relative and absolute accuracies to be achieved. From this,
a specification for
the
control survey may be derived and once this specification has been achieved,
there is no requirement
for
further work.
Whereas
control involves working from ‘the whole to the part’ the specification for all
survey products
is
achieved by working from ‘the part to the whole’. The specification for the
control may be derived from
estimation
based upon experience using knowledge of survey methods to be applied, the
instruments to
be
used and the capabilities of the personnel involved. Such a specification
defines the expected quality of
the
output by defining the quality of the work that goes into the survey.
Alternatively a statistical analysis
of the
proposed control network may be used and this is the preferable approach. In
practice a good
specification will
involve a combination of both methods, statistics tempered by experience. The
accuracy
written down in the field must be in a permanent, legible, unambiguous and easily understood form so that
others may make good sense of the work. Observations and other data should be duplicated at the earliest
possible stage, so that if something happens to the original work the information is not lost. This may be
by photocopying field sheets, or making backup copies of computer files. Whenever the data is in a unique
form or where all forms of the data are held in the same place, then that data is vulnerable to accidental
destruction.
In the case of a control survey, the protection of survey monuments is most important since the precise
coordinates of a point which no longer exists or cannot be found are useless
Basic concepts of surveying
Basic
concepts of surveying
1.1 DEFINITION
Surveying
may be defined as the science of determining the position, in three dimensions,
of natural andman-made
features on or beneath the surface of the Earth. These features may be
represented in analogueform
as a contoured map, plan or chart, or in digital form such as a digital ground model (DGM).
In
engineering surveying, either or both of the above formats may be used for
planning, design andconstruction
of works, both on the surface and underground. At a later stage, surveying
techniques areused
for dimensional control or setting out of designed constructional elements and
also for monitoringdeformation
movements.In the
first instance, surveying requires management and decision making in deciding the
appropriatemethods
and instrumentation required to complete the task satisfactorily to the
specified accuracy andwithin
the time limits available. This initial process can only be properly executed
after very careful anddetailed
reconnaissance of the area to be surveyed.When
the above logistics are complete, the field work – involving the capture and
storage of field data –is
carried out using instruments and techniques appropriate to the task in hand.Processing
the data is the next step in the operation. The majority, if not all, of the
computation willbe
carried out with computing aids ranging from pocket calculator to personal
computer. The methodsadopted
will depend upon the size and precision of the survey and the manner of its
recording; whetherin a
field book or a data logger. Data representation in analogue or digital form
may now be carried outby
conventional cartographic plotting or through a totally automated
computer-based system leading toa
paper- or screen-based plot. In engineering, the plan or DGM is used when
planning and designing aconstruction
project. The project may be a railway, highway, dam, bridge, or even a new town
complex.No
matter what the work is, or how complicated, it must be set out on the ground
in its correct place and to itscorrect
dimensions, within the tolerances specified. To this end, surveying procedures
and instrumentationof
varying precision and complexity are used depending on the project in hand.Surveying
is indispensable to the engineer when planning, designing and constructing a
project, soall
engineers should have a thorough understanding of the limits of accuracy
possible in the constructionand
manufacturing processes. This knowledge, combined with an equal understanding
of the limits andcapabilities
of surveying instrumentation and techniques, will enable the engineer to
complete the projectsuccessfully in the most
economical manner and in the shortest possible time.